Inland Rail Project - 公共プロジェクト現場
-
28th 5月 2025, FYI - Rail Bound Plant Operations
FYI - Rail Bound Plant Operations
添付ファイル :
Safety Alert - Operations Of Rail Bound Plant.pdf
-
05th 10月 2022, RRV - Take 5 - Maintenance Alert
Hi All,
添付ファイル :
Please see attached Maintenance Alert - ITC-113, that is to be briefed to all T&C staff at the start of their next shift and prior to any Road Rail Vehicle operations on the V/Line Network, once staff have been briefed please have the attached SAFO-29 signed as acknowledgement.
Supporting documents have been attached to provide more guidance on RRV operation (ARRS systems) and requirements under 1994 Book of Rules and Operating Procedures if required or please reach out to relevant RAM for further information.
Thank you
Safety
34-134 - Road Rail Operations Rev 21.01 (SW.0114.2021).pdf
ARRS Rail Guidance Operational Manual BW-compressed.pdf
SAFO-29.docx
-
04th 8月 2022, Maintenance Alert_ITC108
PRE-START NIPR- 2002.1, NIFO-2002.2 REV 5 & SAPR-3089
添付ファイル :
(JULY 2022)
ITC108 - PreStart Maintenance Alert.pdf
現在の現場の天気
天気情報は利用できません
観察場所 - Wangaratta, VICTORIA
タイムゾーン - オーストラリア東部標準時
予測 - 土曜日, 24 1月
Mostly sunny.
分: 18C マックス: 42C
降雨の可能性: 5%パーセント
予測場所 - Wangaratta, VICTORIA
タイムゾーン - オーストラリア東部標準時
明日 - 日曜日, 25 1月
Sunny.
分: 17C マックス: 42C
降雨の可能性: 0%パーセント
-
Towing a Disabled Railmax RMT14D/15F Excavator (NIPR-2809.43)
2023/03/17をアップロードしました。
save_alt ダウンロード -
Safe Work Method Statement (SWMS) Form Template (NIFO-2150.1)
2023/03/17をアップロードしました。
save_alt ダウンロード -
Excavation, Trenching and Overhead Services Management (SAPR-73)
2023/03/17をアップロードしました。
save_alt ダウンロード