Delivery Signalling: Bendigo WestCAD Replacement Project - Openbare Project Locatie
-
28th mei 2025, FYI - Rail Bound Plant Operations
FYI - Rail Bound Plant Operations
Bijlagen :
Safety Alert - Operations Of Rail Bound Plant.pdf
-
05th oktober 2022, RRV - Take 5 - Maintenance Alert
Hi All,
Bijlagen :
Please see attached Maintenance Alert - ITC-113, that is to be briefed to all T&C staff at the start of their next shift and prior to any Road Rail Vehicle operations on the V/Line Network, once staff have been briefed please have the attached SAFO-29 signed as acknowledgement.
Supporting documents have been attached to provide more guidance on RRV operation (ARRS systems) and requirements under 1994 Book of Rules and Operating Procedures if required or please reach out to relevant RAM for further information.
Thank you
Safety
34-134 - Road Rail Operations Rev 21.01 (SW.0114.2021).pdf
ARRS Rail Guidance Operational Manual BW-compressed.pdf
SAFO-29.docx
-
04th augustus 2022, Maintenance Alert_ITC108
PRE-START NIPR- 2002.1, NIFO-2002.2 REV 5 & SAPR-3089
Bijlagen :
(JULY 2022)
ITC108 - PreStart Maintenance Alert.pdf
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 00:21
Temperatuur: 19C (App 15C)
Windsnelheid: 19KM/U
Max. Wind: 19KM/U @00:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 18C @22:15 23-1-2026
Max.temp: 31C @18:09 23-1-2026
Windvlaag: 24KM/U
Max. windvlaag: 24KM/U @00:21
Waarneming Locatie - Bendigo, VICTORIA
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zaterdag, 24 januari
Cloud clearing.
Min.: 21C Max.: 39C
Kans op neerslag: 5%
Weerbericht locatie - Bendigo, VICTORIA
Tijdzone - Oost-Australische standaardtijd
Morgen - zondag, 25 januari
Sunny.
Min.: 16C Max.: 40C
Kans op neerslag: 0%
-
Towing a Disabled Railmax RMT14D/15F Excavator (NIPR-2809.43)
17-3-2023 Geüpload
save_alt Downloaden -
Safe Work Method Statement (SWMS) Form Template (NIFO-2150.1)
17-3-2023 Geüpload
save_alt Downloaden -
Excavation, Trenching and Overhead Services Management (SAPR-73)
17-3-2023 Geüpload
save_alt Downloaden
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.