Permit Board - Tarneit West Station

Last Updated 15/04/2026 1:03:00 AM

Type
Employer
Location
Start
End
Status
PER-66206
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1335-O TPA0030911 CH30.190 – CH33.905 Work Type Light Pole Installation on Platform - West Tarneit Station
12:01 AM
12/04/2026
11:59 PM
Scheduled 3 days ago
PER-66632
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1319-O TPA0030893 CH30.750 - CH33.450 Work Type Existing Network Switch Data Download Signalling Isolation and Disconnection TPWS Aerial Installation and Cable Termination - Pre Testing Axle Counter Balance Testing New TNT971ZB1 and TNT972ZB2 Zone Box Testing Reinstatement of Signalling Assets Function Testing and Rectification of Signalling Assets
12:01 AM
12/04/2026
11:59 PM
Scheduled 3 days ago
PER-60857
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1054-O TPA0030680 CH 31.980 - 32.350 Work Type Post-Occupation Works - Stage 1 - Impact Type 1 Works (WGS Supervision): • Back of platform maintenance path construction (outside rail corridor) • Batter final surface trimming & embankment layers (outside rail corridor) • Balustrade and handrail works (hand tools only) Impact Type 1 Works (TFPC Supervision): • Back of platform maintenance path construction (within rail corridor) • Batter final surface trimming & embankment layers (within rail corridor) • Underpass topping slab construction (without heavy plant use i.e. Franna/Crane, Boom Pump) • Underpass structural steel frame & cladding installation (without plant/machinery use on station platforms) Impact Type 3 Works (Lookout Protection with Engineering Controls): • Underpass topping slab construction (using heavy plant i.e. Franna/Crane, Boom Pump) • Station platform perimeter beams & platform light pole pad footings • Station entrance canopy pad footings (Precast) • Station entrance slabs & ramps • Station entrance stairs
12:01 AM
28/01/2026
11:59 PM
28/04/2026
In Progress
PER-60922
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1076-O TPA0030680 CH 31.980 - 32.350 Work Type Post-Occupation Works - Stage 2 - Impact Type 1 (TFPC/WGS Supervision): • Back of platform and batter pit & conduits • Batter pole foundations • Back of platform fencing • Platform canopy structural secondary steel works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) • Platform cladding and roofing finishing works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) • Platform hydraulics works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) Impact Type 3 (Lookout Including Use of Engineering Controls): • Platform canopy structural secondary steel works • Platform cladding and roofing finishing works • Platform hydraulics works • Installation of entrance canopies (excluding lifting of columns & beams) Impact Type 4 (Track Force Protection): • Installation of entrance canopies
12:01 AM
2/02/2026
11:59 PM
29/04/2026
In Progress
PER-60889
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1084-O TPA0030680 CH 31.980 - 32.350 Work Type - Post-Occupation Works - Stage 3: • Batter and Carpark Connection Drainage • Swale Drainage
12:01 AM
2/02/2026
11:59 PM
29/04/2026
In Progress
PER-63266
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1130-O TPA0030680 CH 31.980 - 32.350 Work Type Post-Occupation Works - Stage 2 - Impact Type 1 (TFPC/WGS Supervision): • Back of platform and batter pit & conduits • Batter pole foundations • Back of platform fencing • Platform canopy structural secondary steel works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) • Platform cladding and roofing finishing works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) • Platform hydraulics works (with no potential to encroach danger zone, and no plant/machinery use on station platforms) Impact Type 3 (Lookout Including Use of Engineering Controls): • Platform canopy structural secondary steel works • Platform cladding and roofing finishing works • Platform hydraulics works • Installation of entrance canopies
12:01 AM
10/02/2026
11:59 PM
29/04/2026
In Progress
PER-58579
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_0863-O TPA0030237 KP 31.480 – KP 32.350 Work Type - Impact Type 1 Works (TFPC Supervision): • Crane pad construction (locations as per the diagram on page 3). • Rail delineation fencing - blue & white parawebbing or blue flagging with star pickets (min 4m from outermost edge of track). • Construction of platform embankments. • Installation of canopy foundations & columns - blinding, grouting, and concrete works only. • Installation of prefabricated buildings (PSO and CER). Impact Type 4 Works (Track Force Protection): • Installation of canopy foundations & columns - lifting & installing precast footings and canopy columns.
12:01 AM
5/01/2026
11:59 PM
30/04/2026
In Progress
PER-64420
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1177-O TPA0030721 CH32.000 to CH32.316 Work Type Scope of works include: • Station – Above Ground Containment • Building Electrical Systems Cabling • General OCS, Lighting & Electrical Fit-out and Device Installation • Carpark and Bus Loop: Pole, Lighting & OCS Device Installation
12:01 AM
1/03/2026
11:59 PM
30/04/2026
In Progress
PER-66633
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1336-O TPA0030890 CH32.100 Work Type Radio Tower Installation: Footing Excavation Pre- Assembly and Fit Out Lifting Operations
12:01 AM
10/04/2026
11:59 PM
30/04/2026
In Progress
PER-63200
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1162-O TPA0030680 CH31.980 - CH32.350 Work Type Post Occupation Works – Stage 5 • Construction of Parkiteer • Construction of Pump Station • Construction of Bus Shelter
12:01 AM
16/02/2026
11:59 PM
16/05/2026
In Progress
PER-63299
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1133-O TPA0030680 CH32.000 - CH32.350 Work Type Post Occupation Works – Stage 4 • Concrete Walkway & Shared User Path construction • Pavement and Subsoil Drain Construction • Kerb Installation • Asphalting of Carparks • Signage and Linemarking Installation
12:01 AM
19/02/2026
11:59 PM
19/05/2026
In Progress
PER-66221
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1256-O TPA0030847 CH42.550 Work Type Red and Yellow: Wyndham Vale South SER (WVSER)
12:01 AM
16/03/2026
11:59 PM
22/05/2026
In Progress
PER-63167
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1172-O TPA0030700 30.200kp - 33.905kp Work Type Signalling Day Works: • Trackside unit installation and cable hauling & termination - Grubbing near and around pits • Installation of double width zone boxes and cable hauling & termination • Civil works • Reds & Yellows • Pre-testing • Grubbing around existing pits
12:01 AM
19/02/2026
11:59 PM
28/05/2026
In Progress
PER-63694
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1118-O TPA0030700 30.200kp - 33.905kp Work Type Signalling Day Works: • Trackside unit installation and cable hauling & termination • Installation of double width zone boxes and cable hauling & termination • Civil works • Reds & Yellows • Pre-testing
12:06 AM
9/02/2026
11:59 PM
28/05/2026
In Progress
PER-66223
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1289-O TPA0030700 30.200kp - 33.905kp Work Type Signalling Day Works: • Trackside unit installation and cable hauling & termination - Grubbing near and around pits • Installation of double width zone boxes and cable hauling & termination • Civil works • Reds & Yellows • Pre-testing • Grubbing around existing pits • Cable Hauling and Joint Preparation
12:01 PM
17/03/2026
11:58 PM
30/05/2026
In Progress
PER-57325
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_0706-O TPA0030106 CH31500 - CH32600 Work Type Impact Type 1 Works (WGS Supervision): • Use of maintenance access track between Tarneit Road and the site. • Site boundary fencing installation (excluding rail delineation fencing) >15m from track. • Haul road and lay-down construction >15m from track. • Dilapidation survey works >15m from track. • Site compound installation. Impact Type 1 Works (TFPC Supervision): • Site boundary fencing installation (excluding rail delineation fencing) within 15m of track. • Haul road and lay-down construction within 15m of track. • Dilapidation Survey works within 15m of track. • Service proving of the CSR.
12:01 AM
5/01/2026
11:59 PM
10/06/2026
In Progress
PER-57326
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_0707-O TPA0030153 31.480kp – 32.600kp Work Type Impact Type 1 Works (WGS Supervision): • Carpark pavement construction • Drainage installation • Electrical and OCS installation • Hydraulic and sewer installation • Building foundation installation • CSR works outside the Rail Corridor Impact Type 1 Works (TFPC Supervision): • CSR works inside rail corridor
12:01 AM
5/01/2026
11:59 PM
10/06/2026
In Progress
PER-58580
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_0862-O TPA0029813 Deer Park 17.938kp – Wyndham Vale South 42.550kp Work Type Signal Correlation works - Visual inspection only
12:01 AM
5/01/2026
11:59 PM
30/06/2026
In Progress
PER-63925
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_1224-O TPA0030601 KP31.920 – KP32.150 Work Type Track monitoring survey works: Hand Tools only
12:01 AM
28/02/2026
11:59 PM
31/07/2026
In Progress
Site Access Permit
WPA - Western Program Alliance
David Swan
+ 6 other supervisors
Deer Park JCT to Manor JCT / SAP_0865-O TPA0030433 Tarneit to Wyndham Vale South ~ KP 29.500 - KP 42.550 Work Type Signalling Cable Installation & Removal Works
12:01 AM
5/01/2026
11:59 PM
14/04/2026
Expired 1 hour ago
Not Stopped