PER-66830
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1444-O_TPA0030873 Dudley street SER & DRS(West Melbourne) Work Type 1. Configuration upload, firmware checks 2. Correspondence tests, SFP checks 3. Static tests (FRNT, Routing, etc) 4. Dynamic Tests (FRNT) 5. Bandwidth & Latency Tests (Local DUDSER Ring only) Contractor to ensure the works are strictly non-intrusive (to any live comms or operations). The work group shall be accompanied by either V/Line Tech systems or SMT.
7:00 AM
13/04/2026
13/04/2026
6:00 PM
16/04/2026
16/04/2026
In Progress
PER-56935
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0729-O_TPA0029745 Creswick and Clunes (KP175.500 – KP193.664) Work Type Signalling construction including cable hauling, Cable terminations and testing, Use of hand tools, Installation of bollards, fence and hand railing CSR and defects rectification works Access tracks remediation and maintenance
7:00 AM
12/01/2026
12/01/2026
6:00 PM
20/04/2026
20/04/2026
In Progress
PER-60724
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1055-O_TPA0029708 Maryborough(KP217.862 – KP228.929) Work Type NDD, CSR and Access Track.
7:00 AM
23/01/2026
23/01/2026
6:00 PM
23/04/2026
23/04/2026
In Progress
PER-56963
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Dunolly to Mildura / SAP_0709-O_TPA0029901 Ouyen - Yelta corridor(KP505.947 – KP512.029) & on the Murrayville Corridor(KP512.029 – KP474.380) Work Type The works under Impact type 1(TFPC supervision) - Dilapidation Investigations, Site Inspections, Non-Intrusive Signal Inspections, Signal Site Walks, photography. The works under Impact type 2(Look out Protection) - Non-Intrusive Signal Inspections, Signal Site Walks, Photography. No Construction works permitted under this SAP
7:00 AM
12/01/2026
12/01/2026
6:00 PM
23/04/2026
23/04/2026
In Progress
PER-56666
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0689-O / TPA0030394 Maryborough - KP217.862 – KP228.929 on the Yelta Corridor and KP208.500 – MYB6 on the Ararat Corridor. Work Type Location case Installation works. Note - the Vic Track ODU is outside V/Line lease and this SAP doesn't include the works
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-56665
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0670-O / TPA0030024 Ararat to Maryborough - Pyrenees HWY(KP191.200-191.250), Derby Rd(KP188.400-188.580),Mariners Reef Rd(KP187.920-188.050) Maryborough(KP223.400-223.850), Lean St(KP222.300-222.600) Maryborough to Dunolly - Tullaroop Rd(KP225.750 - 225.850), Dooleys Rd(KP226.850 -226.950) Work Type Establish Laydown areas and delivery of materials - Works under TFPC supervision. The site compound is outside V/Line lease.
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-56632
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0669-O / TPA0030186 Tourello(KP186.000 – KP186.962) Work Type 1. Building Install Completions 2. Fencing Install Completions 3. Internal Building Fit out (CER, PER, SEH) and Radio Tower Finishings 4. External Power Connection 5. Building finishings 6. CCTV Inside Rooms No Commissioning works allowed under this SAP.
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-56962
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0712-O_TPA0029858 Creswick and Clunes(KP173.761 – KP194.010) Work Type Site inspections, Dilap survey, General survey, NDD, Geo Tech, Soil Testing, Non intrusive signal sightings, signal walk sightings, Photography. No Construction activity permitted under this SAP
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-57623
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_0754-O_TPA0030392 Maryborough KP208.500 – KP223.650 (Ararat to Maryborough Corridor) & KP217.500 – KP228.929(Yelta Corridor) Work Type Install Track Signal Equipment and Preparation Works, Install Axel Counters, GAK, Foundations and TPWS, Cable & Fibre Hauling, Install Cables - GAK, Cable Terminations and Electrical Connections (Inc Fibre termination),IR Testing, Meggering and Communication Testing (New Locations). This SAP doesn't permit connection to any existing signalling assets or any Commissioning activity
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-57754
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Maryborough to Dunolly / SAP_0807-O_TPA0030112 KP208.500 and KP217.862 to Signal Post MYB6 and Signal Post MYB6 to KP228.929 Work Type Maryborough – Cable Haul Signalling Works Main Line 1. Cable Hauling Only 2. Cleaning of Pits 3. Installation of Bollards Use of Hand Tools only
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-57755
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Maryborough to Dunolly / SAP_0807-O_TPA0030112 KP208.500 and KP217.862 to Signal Post MYB6 and Signal Post MYB6 to KP228.929 Work Type Maryborough – Cable Haul Signalling Works Main Line 1. Cable Hauling Only 2. Cleaning of Pits 3. Installation of Bollards Use of Hand Tools only
7:00 AM
12/01/2026
12/01/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-65641
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1354-O_TPA0030392 Maryborough KP208.500 – KP223.650 (Ararat to Maryborough Corridor) & KP217.500 – KP228.929(Yelta Corridor) Work Type Install Track Signal Equipment and Preparation Works, Install Axel Counters, GAK, Foundations and TPWS, Cable & Fibre Hauling, Install Cables - GAK, Cable Terminations and Electrical Connections (Inc Fibre termination),IR Testing, Meggering and Communication Testing (New Locations), Reds and yellows(as per the signed NIFO checklist). This SAP doesn't permit connection to any existing signalling assets or any Commissioning activity.
7:00 AM
25/03/2026
25/03/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-65840
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1375-O_TPA0030971 Various Stockpile Locations in Maryborough(KP217.862 – KP222.659) Work Type Rail Free Welding works
7:00 AM
27/03/2026
27/03/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-66831
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1445-O_TPA0030989 Working at Maryborough Yard Siding Roads(under Impact type 5 Booking out of Track) Work Type Installation of a new standard gauge catchpoint at MYB11(KP 223.872) & associated works as below - Removal of existing track, Plain track construction, Ballast handling, track surfacing, welding/destressing, civil and signalling defects, signalling asset fit out/testing, Cable/fibre hauling and terminations.
7:00 AM
13/04/2026
13/04/2026
6:00 PM
24/04/2026
24/04/2026
In Progress
PER-66829
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1421-O_TPA0029902 Ararat to Maryborough Corridor (KP191.256 – KP223.350) Ballarat to Maryborough Corridor (KP218.400 – KP232.300) Work Type The works under Impact type 1(TFPC supervision) - Service proving (NDD),Geotech Investigations, Soil Testing, Surveying, Dilapidation Investigations, Site Inspections, Non-Intrusive Signal Inspections, Signal Site Walks, photography. The works under Impact type 2(Look out Protection) - Non-Intrusive Signal Inspections, Signal Site Walks, Photography. No Construction works permitted under this SAP.
7:00 AM
13/04/2026
13/04/2026
6:00 PM
25/04/2026
25/04/2026
In Progress
PER-59965
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1008-O_TPA0030746 Various location between Creswick and Clunes(KP176.032 – KP192.551) Work Type Location case cable equipment install termination and testing. Communications equipment installation No Commissioning activity permitted under this SAP.
7:00 AM
14/01/2026
14/01/2026
6:00 PM
30/04/2026
30/04/2026
In Progress
PER-62605
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1189-O_TPA0029745 Signalling construction including cable hauling, Cable terminations and testing, Use of hand tools, Installation of bollards, fence and hand railing CSR and defects rectification works Access tracks remediation and maintenance Reds and yellows inside Location Cases ARFGR, CRFGR, CSHRFGR, CWKZB, TRFGR, BRMDR, CLVZB & WSFGR
7:00 AM
24/02/2026
24/02/2026
6:00 PM
30/04/2026
30/04/2026
In Progress
PER-62606
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1188-O_TPA0029745 Creswick and Clunes (KP173.000 – KP193.664) Work Type Signalling construction including cable hauling, Cable terminations and testing, Use of hand tools, Installation of bollards, fence and hand railing CSR and defects rectification works Access tracks remediation and maintenance Reds and yellows inside Location Cases ARFGR, CRFGR, CSHRFGR, CWKZB, TRFGR, BRMDR
7:00 AM
23/02/2026
23/02/2026
6:00 PM
30/04/2026
30/04/2026
In Progress
PER-63793
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1218-O_TPA0030294 Maryborough (KP223.742 – KP224.820) - various locations Work Type Location Case & Huts Field fit out works of new locations. (Location Case cable Equipment install, Termination & Testing) Communications Equipment Installation This SAP doesn't permit any works inside V/Line Live Enclosures.
7:00 AM
1/03/2026
1/03/2026
6:00 PM
29/05/2026
29/05/2026
In Progress
PER-65245
Site Access Permit
Acciona Rail
Bret Marshall
+ 8 other supervisors
Ballarat to Maryborough / SAP_1318-O_TPA0030294 Maryborough(KP219.000 – KP229.000) on the Ballarat Corridor KP187.900 – KP188.600 on the Ararat Corridor Work Type Location Case & Huts Field fit out works of new locations. (Location Case cable Equipment install, Termination & Testing) Communications Equipment Installation This SAP doesn't permit any works inside V/Line Live Enclosures.
7:00 AM
17/03/2026
17/03/2026
6:00 PM
30/05/2026
30/05/2026
In Progress